Our Featured
Projects
Roads and Highways

Kohat Tunnel and Access Roads Project
Location: Kohat, Pakistan
Client: National Highway Authority (NHA)
Main Contractor: HRL
Contract Value: US$ 45 Million
Scope of Work
Road in hilly area: 7 Km
Rock excavation by blasting: 400,000 m³
Road embankment in common soil: 156,000 m³
Road embankment in rock soil: 418,000 m³
RCC Pipe Culverts: 270 m
Stone Pitching: 29,000 m²
Concrete lined roadside drains: 8,000 m

Lahore Sheikhupura Faisalabad Dual
Carriageway BOT-2 Project
Location: Khurrianwala, Faisalabad
Client: C&W Deptt. Govt. of Punjab
Main Contractor: HRL
Contract Value: US$ 23.5 Million
Scope of Work
Earthwork
Base/Sub-base
Concrete Structures
Asphalt Concrete
Brick Work
Dismantling and Removing of Existing Road Pavements
Lighting Poles and Mulba Shifting
Road Embankment in Common Soil
RCC Pipe Culverts
Stone Pitching
Concrete Lined Roadside Drains

M1 Islamabad - Peshawar Motorway
Location: Islamabad to Peshawar
Client: National Highway Authority (NHA)
Main Contractor: HRL
Contract Value: US$ 28 Million
Scope of Work
Road work including 6 bridges and 5 flyovers
Road work: 7 Kilometers
Fence & lane marking works
Multispan: 5 Flyovers at multiple locations
Multispan: 6 Bridges at multiple locations
Structure work (0~35 Kilometers)
Pile driving & testing
Earthwork: 720,000 M³
Asphalt work: 30,000 Tons

Lahore Ring Road (Package-3)
Location: Niazi Chowk to Mehmood Booti, Lahore
Client: Punjab Highway Department (C&W)
Main Contractor: HRL - Khalid Rauf (Joint Venture)
Contract Value: US$ 31 Million
Scope of Work
Complete Civil Works
Clearing & Grubbing 303,200m²
Removal of Trees
Compaction of Natural Ground 303,200m²
Excavate Unsuitable or Surplus Common Material 387,300m³
Structural Excavation in Common Material 153,100m³
Granular Back Fill 13,100m³
Granular Back Fill with Sand 17,000m³
Common Backfill 17,400m³
Select Fill Material 3,500m³
Formation of Embankment from Roadway Excavation in Common Material 40,412m³
Formation of Embankment from Borrow Excavation in Common Material 1,290,000m³
Formation of Embankment from Structural Excavation in Common Material 65,500m³
Sub Grade Preparation in Earth Cut 107,100m²
Electrification

Multan Metro Bus Project (Package)
Location: Fish Market to Chungi No.14, Multan
Client: Multan Development Authority
Main Contractor: CRFG-HRL-Matracon JV
Contract Value: US$ 25.78 Million
Scope of Work
Total Length: 1.710KM
Bus Stations: 03 Nos.
Total Piles: 368 No. (30M Long)
Total Piers & Transoms: 68 No.
Box Girders: 84 No.
I-Girders: 219 No.
C-Girders: 86 No.
Total Concrete: 38,000m³
Total Rebar Steel: 6924 Tons

Widening & Strengthening of National Highway N-70 (Rakhi Gajj - Bewata Section)
Location: D.G. Khan (Punjab)
Client: National Highway Authority (NHA)
Main Contractor: Taisei Corporation
Contract Value: US$ 65 Million (approx.)
Scope of Work
33.84 Km of East West Road Improvement Project (Package-I) Sta. 7+600 to Sta. 19+500
Earthworks
Structures
SP-415 Cast in Place Concrete Pile (Deep Foundation)
Drainage and Erosion Works
Ancillary Works
Steel Structures
Concrete Works

Construction of 4-Lane Bridge & Approach Roads (Package-1) Taunsa-Layyah Road Project
Location: Layyah (Punjab)
Client: National Highway Authority (NHA)
Main Contractor: HRL-SEW Joint Venture
Contract Value: US$ 46 Million (approx)
Scope of Work
Length of Canal Bridge: 1123m approx. (4-Lane)
Total Length of Approach Road: 20.1 Km (2-Lane)
East Bank: 3.88 Km (Out of 8.88 Km)
Khokhar-Layyah Road: (2-Lane)
West Bank: 16.30 Km Approx.
From Proposed Bridge to N-55: (2-Lane)
River Training Works

Construction of Interchange, Overlay and Extension of Super Highway to Motorway (M-9)
Location: Hyderabad
Client: Frontier Works Organization (FWO)
Main Contractor: HRL
Contract Value: US$ 20 Million
Scope of Work
Construction of Interchange at RD 66+850 and Construction Pavement at RD 68+640 KM to 70+040 Km for Overlay and Extension of Super Highway to Motorway (M-9) Project
Construction of Overlay and Extension of Super Highway to Motorway (M-9) Project from Km 60+000 to Km 70+000

RYK-TMP Dual Carriageway (M-5)
Location: Rahim Yar Khan
Client: NHA / FWO
Main Contractor: HRL
Contract Value: US$ 32 Million
Scope of Work
Earthwork: 187,584 m³ (13 Kilometers)
Sub-Base/Base: 266,497 m³
Asphaltic Concrete: 139,642 tons
Structure: 4,971 m³
DST: 50,371 m²